Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Creech AFB Completes Fastest Non-Emergency Runway Paving Project in Air Force History [Image 3 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Creech AFB Completes Fastest Non-Emergency Runway Paving Project in Air Force History

    CREECH AIR FORCE BASE, NEVADA, UNITED STATES

    10.30.2025

    Photo by Senior Airman Renee Blundon 

    432nd Wing   

    Construction vehicles transport and compact new asphalt during a runway restoration project at Creech Air Force Base, Nevada, Oct. 30, 2025. Crews removed 80 feet of the 150-foot-wide runway and replaced the deteriorated pavement to improve surface strength and ensure reliable support for 432nd Wing operations. (U.S. Air Force photo by Senior Airman Renee Blundon)

    IMAGE INFO

    Date Taken: 10.30.2025
    Date Posted: 12.12.2025 11:24
    Photo ID: 9437793
    VIRIN: 251030-F-NV774-1034
    Resolution: 6224x4672
    Size: 7.43 MB
    Location: CREECH AIR FORCE BASE, NEVADA, US

    Web Views: 6
    Downloads: 2

    PUBLIC DOMAIN