Naval Facilities Engineering Systems Command Northwest awarded a $377.7 million task order Sept. 2 to Kiewit-Alberici Joint Venture (KAJV) to seismically upgrade Puget Sound Naval Shipyard & Intermediate Maintenance Facility’s Dry Dock 4. Barges and Cranes are moved in to the dry dock OCT 29, Brem WA.
| Date Taken: | 10.29.2025 |
| Date Posted: | 11.19.2025 16:34 |
| Photo ID: | 9395021 |
| VIRIN: | 251029-N-GD259-1474 |
| Resolution: | 3684x4328 |
| Size: | 2.94 MB |
| Location: | BREMERTON, WASHINGTON, US |
| Web Views: | 1 |
| Downloads: | 0 |
This work, Beginning Dry Dock-4 Seismic Upgrades [Image 5 of 5], by Wendy M Hallmark, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.