U.S. Air Force Staff Sgt. Joshua Eckelberry, 133rd Maintenance Group, drags an auxiliary power unit cable in St. Paul, Minn., Sept. 24, 2025. In 2026, the 133rd Airlift Wing is expected to begin a three-year process to modernize from the C-130H3 Hercules to the C-130J-30 Super Hercules.
(U.S. Air National Guard photo by Amy M. Lovgren)
| Date Taken: | 09.24.2025 |
| Date Posted: | 11.20.2025 10:59 |
| Photo ID: | 9394229 |
| VIRIN: | 250924-Z-LY731-1013 |
| Resolution: | 3300x2550 |
| Size: | 3.19 MB |
| Location: | ST. PAUL, MINNESOTA, US |
| Web Views: | 6 |
| Downloads: | 2 |
This work, Preparing for the Future [Image 4 of 4], by MSgt Amy Lovgren, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.