Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    The 104th Fighter Wing Begins Construction Project with the 103rd Airlift Wing [Image 2 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The 104th Fighter Wing Begins Construction Project with the 103rd Airlift Wing

    WESTFIELD, MASSACHUSETTS, UNITED STATES

    09.26.2025

    Photo by Airman 1st Class Ellen Ozkaptan 

    104th Fighter Wing

    Power cables hang from the ceiling to charge the fire truck's batteries at Barnes Air National Guard Base, Westfield, Mass., Sept. 26, 2025. Members from the 103rd Airlift Wing helped the transition from using cones to hold the wires to having them hang from the ceiling. (U.S. Air National Guard photo by Airman 1st Class Ellen Ozkaptan)

    IMAGE INFO

    Date Taken: 09.26.2025
    Date Posted: 10.02.2025 11:19
    Photo ID: 9347908
    VIRIN: 250926-Z-JG244-2526
    Resolution: 6048x4024
    Size: 9.11 MB
    Location: WESTFIELD, MASSACHUSETTS, US

    Web Views: 3
    Downloads: 1

    PUBLIC DOMAIN