Plans lay on the table to demonstrate what the completed static displays will look like at Barnes Air National Guard Base, Westfield, Mass., Sept. 26, 2025. The 104th Fighter Wing collaborated with the 103rd Airlift Wing to complete the project. (U.S. Air National Guard photo by Airman 1st Class Ellen Ozkaptan)
| Date Taken: | 09.26.2025 |
| Date Posted: | 10.02.2025 11:19 |
| Photo ID: | 9347906 |
| VIRIN: | 250926-Z-JG244-6901 |
| Resolution: | 6048x4024 |
| Size: | 8.68 MB |
| Location: | WESTFIELD, MASSACHUSETTS, US |
| Web Views: | 4 |
| Downloads: | 2 |
This work, The 104th Fighter Wing Begins Construction Project with the 103rd Airlift Wing [Image 4 of 4], by A1C Ellen Ozkaptan, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.