USACE Baltimore District personnel oversee National Park Service installation of flood barrier panels during the annual 17th Street closure exercise along the National Mall in Washington, D.C., September 25, 2025. The post-and-panel structure at 17th Street and Constitution Avenue represents the most visible component of the Potomac Park Levee System, designed by USACE Baltimore District and can be fully deployed in preparation for high water events as part of the larger Washington, D.C., Flood Risk Management Project.
Date Taken: | 09.24.2025 |
Date Posted: | 09.25.2025 11:43 |
Photo ID: | 9339272 |
VIRIN: | 250924-A-ND890-6480 |
Resolution: | 9504x6336 |
Size: | 5.98 MB |
Location: | DISTRICT OF COLUMBIA, US |
Web Views: | 1 |
Downloads: | 0 |
This work, Federal Oversight Ensures Infrastructure Readiness [Image 6 of 6], by David Gray, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.