Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    178th Wing Completes Combat Readiness Inspection [Image 8 of 22]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    178th Wing Completes Combat Readiness Inspection

    SPRINGFIELD-BECKLEY AIR NATIONAL GUARD BASE, OHIO, UNITED STATES

    09.07.2025

    Photo by Staff Sgt. Constantine Bambakidis 

    178th Wing

    U.S. Air Force Staff Sgt. Kyle Fulton, a civil engineer with the 178th Civil Engineer Squadron, removes debris from a damaged section of simulated runway during an exercise on Springfield-Beckley Air National Guard Base, Ohio, 14 July, 2025. When a runway is damaged, a section is cut out around the damage and filled in with concrete. (U.S. Air National Guard photo by Staff Sgt. Constantine Bambakidis)

    IMAGE INFO

    Date Taken: 09.07.2025
    Date Posted: 09.10.2025 15:29
    Photo ID: 9297953
    VIRIN: 250714-Z-LB784-1009
    Resolution: 6048x4024
    Size: 1.1 MB
    Location: SPRINGFIELD-BECKLEY AIR NATIONAL GUARD BASE, OHIO, US

    Web Views: 0
    Downloads: 0

    PUBLIC DOMAIN