U.S. Air Force Staff Sgt. Kyle Fulton and Airman 1st Class Jared Nethers, civil engineers with the 178th Civil Engineer Squadron, remove a section of damaged concrete in a Rapid Airfield Damage Repair exercise on Springfield-Beckley Air National Guard Base, Ohio, 14 July, 2025. The goal of the RADR exercise is to repair damage to an operational runway as quickly as possible. (U.S. Air National Guard photo by Staff Sgt. Constantine Bambakidis)
Date Taken: | 09.07.2025 |
Date Posted: | 09.10.2025 15:29 |
Photo ID: | 9297934 |
VIRIN: | 250714-Z-LB784-1005 |
Resolution: | 5269x3506 |
Size: | 1.44 MB |
Location: | SPRINGFIELD-BECKLEY AIR NATIONAL GUARD BASE, OHIO, US |
Web Views: | 0 |
Downloads: | 0 |
This work, 178th Wing Completes Combat Readiness Inspection [Image 22 of 22], by SSgt Constantine Bambakidis, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.