Approximately 12,000 cubic feet per second being released from one gate at Hugo Dam during a Gate Operational Capabilities Inspection, in Hugo, Okla., July 8, 2025. The USACE conducts GOCI as part of its five year, periodic inspections of dams. (Courtesy Photo by Stephanie Bozarth, USACE).
Date Taken: | 07.08.2025 |
Date Posted: | 07.16.2025 12:42 |
Photo ID: | 9182993 |
VIRIN: | 250708-A-A5050-9813 |
Resolution: | 2016x3024 |
Size: | 3.44 MB |
Location: | OKLAHOMA, US |
Web Views: | 5 |
Downloads: | 0 |
This work, Engineers, lake office staff leverage high water, creativity to GOCI Hugo Dam [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.