Two newly designed spillway gates sit on a large platform next to another platform June 27, 2025, at Center Hill Dam in Lancaster, Tenn. The large platform will be transferred over the dam for the ongoing spillway gate replacement project. The Nashville District awarded a $91.25 million contract Sept. 29, 2022, to American Bridge Company for the Center Hill Dam Spillway Gates Replacement Project. The contract includes the fabrication of eight new spillway gates; removal of the existing gates and associated lifting machinery; and installation of the new gates and equipment.
Date Taken: | 06.27.2025 |
Date Posted: | 07.11.2025 15:54 |
Photo ID: | 9175486 |
VIRIN: | 250627-A-EO110-1001 |
Resolution: | 7360x4912 |
Size: | 17.96 MB |
Location: | LANCASTER, TENNESSEE, US |
Hometown: | NASHVILLE, TENNESSEE, US |
Web Views: | 47 |
Downloads: | 1 |
This work, Center Hill Dam Spillway Gates Replacement Project, by Leon Roberts, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.