Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Osan 2035: Charting the Future of the Installation [Image 3 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Osan 2035: Charting the Future of the Installation

    OSAN AIR BASE, SOUTH KOREA

    06.13.2025

    Photo by Tech. Sgt. Desiree Ware  

    51st Fighter Wing

    51st Fighter Wing leadership attend the Osan 2035 Installation Development Plan board at Osan Air Base, Republic of Korea, June 13, 2025. Attendees reviewed planning materials, maps, and visual renderings illustrating how Osan will evolve to meet future mission and community needs. (U.S. Air Force photo by Tech. Sgt. Desiree Ware)

    IMAGE INFO

    Date Taken: 06.13.2025
    Date Posted: 06.24.2025 03:24
    Photo ID: 9128498
    VIRIN: 250613-F-NZ346-1091
    Resolution: 4528x3016
    Size: 714.47 KB
    Location: OSAN AIR BASE, KR

    Web Views: 2
    Downloads: 1

    PUBLIC DOMAIN