U.S. Navy personnel and civilian engineers stand at the Vertical Launch Slip at Naval Base Ventura County, where they partnered to restore the structure’s operational capability. The joint effort between NAWCWD, NAVFAC Southwest and the Seabees of Naval Construction Group One enabled the safe launch and recovery of unmanned surface targets. (U.S. Navy photo by Michael Smith)
Date Taken: | 05.21.2025 |
Date Posted: | 05.29.2025 16:41 |
Photo ID: | 9071248 |
VIRIN: | 250522-N-TC277-1401 |
Resolution: | 4908x2761 |
Size: | 1.42 MB |
Location: | PORT HUENEME, CALIFORNIA, US |
Web Views: | 27 |
Downloads: | 0 |
This work, NAWCWD project saves $5 million, restores launch site through engineering [Image 3 of 3], by Michael Smith, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.