A worker is seen preparing a deep mix method machine in Natomas, California, on May 6, 2025. The machines bore down more than 100 feet deep to install a cutoff wall and prevent through- and under- seepage of water along the Natomas Basin levee. Our mission is to reinforce 42 miles of levee surrounding the Natomas Basin in partnership with the State of California and the Sacramento Area Flood Control Agency.
Date Taken: | 05.07.2025 |
Date Posted: | 05.21.2025 15:15 |
Photo ID: | 9052666 |
VIRIN: | 250521-A-PZ119-1417 |
Resolution: | 1710x2550 |
Size: | 4.04 MB |
Location: | SACRAMENTO, CALIFORNIA, US |
Web Views: | 8 |
Downloads: | 1 |
This work, Natomas Basin Levee Work [Image 6 of 6], by Joseph Bruton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.