Airmen from the 5th Civil Engineer Squadron work on renovating the floor of the 5th Bomb Wing headquarters on Minot Air Force Base, North Dakota, April 18, 2025. Minot AFB’s infrastructure was built during the Cold War and thus the building’s piping required a complete overhaul when it was damaged by tree roots and degradation over time. (U.S. Air Force photo by Senior Airman Kendra A. Ransum)
Date Taken: | 04.18.2025 |
Date Posted: | 05.02.2025 13:32 |
Photo ID: | 9008477 |
VIRIN: | 250418-F-UR202-1516 |
Resolution: | 6048x3780 |
Size: | 16.5 MB |
Location: | MINOT AIR FORCE BASE, NORTH DAKOTA, US |
Web Views: | 9 |
Downloads: | 0 |
This work, From boilers to backhoes: How 5 CES keeps Minot AFB’s heart beating [Image 8 of 8], by SrA Kendra Ransum, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.