Broken-up concrete is shoveled into a bucket inside the command suite of the 5th Bomb Wing headquarters on Minot Air Force Base, North Dakota, April 15, 2025. A degraded sewer line that serviced both the building’s women’s restroom and the command suite failed, requiring the old pipe system to be ripped out and replaced. (U.S. Air Force photo by Senior Airman Kendra A. Ransum)
Date Taken: | 04.15.2025 |
Date Posted: | 05.02.2025 13:32 |
Photo ID: | 9008470 |
VIRIN: | 250415-F-UR202-1345 |
Resolution: | 6048x4024 |
Size: | 21.34 MB |
Location: | MINOT AIR FORCE BASE, NORTH DAKOTA, US |
Web Views: | 1 |
Downloads: | 1 |
This work, From boilers to backhoes: How 5 CES keeps Minot AFB’s heart beating [Image 8 of 8], by SrA Kendra Ransum, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.