A C-130J Super Hercules aircraft assigned to the 37th Airlift Squadron, lands on a temporary landing zone during exercise Agile Bison 25-1 at Chièvres Air Base, Belgium, April 14, 2025. Training with the aircraft in austere conditions allowed crews to refine their ability to deliver critical supplies and personnel where traditional runways may not exist. (U.S. Air Force photo by Senior Airman Edgar Grimaldo)
Date Taken: | 04.14.2025 |
Date Posted: | 04.21.2025 09:15 |
Photo ID: | 8984207 |
VIRIN: | 250414-F-VY348-1511 |
Resolution: | 5490x3039 |
Size: | 5.6 MB |
Location: | CHIEVRES, BE |
Web Views: | 34 |
Downloads: | 3 |
This work, No runway, no problem; Agile Bison 25-1 tests rapid deployment tactics at Chièvres AB [Image 14 of 14], by SrA Edgar Grimaldo, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.