U.S. Air Force Airmen operate compaction equipment to prepare subgrade to install asphalt in the U.S. Central Command area of responsibility, Feb. 18, 2025. Airmen are trained to operate various pieces of equipment to rapidly develop and support emerging needs in a dynamic environment. (U.S. Air Force photo by Master Sgt. Luke Olson)
Date Taken: | 02.18.2025 |
Date Posted: | 03.28.2025 04:41 |
Photo ID: | 8940575 |
VIRIN: | 250218-F-LQ671-1097 |
Resolution: | 6828x4552 |
Size: | 3.08 MB |
Location: | (UNDISCLOSED LOCATION) |
Web Views: | 7 |
Downloads: | 1 |
This work, Airmen build and expand a hot cargo pad and marshalling yard in the U.S. CENTCOM AOR [Image 7 of 7], by MSgt Luke Olson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.