U.S. Air Force assigned to the 332nd Expeditionary Civil Engineering Squadron vehicles prep the subgrade for a contractor to install asphalt on a hot cargo pad extension in the U.S. Central Command area of responsibility, Feb. 15, 2025. The extension will allow multiple aircraft to load and unload cargo simultaneously, expanding capabilities in the region. (U.S. Air Force photo by Master Sgt. Luke Olson)
Date Taken: | 02.15.2025 |
Date Posted: | 03.28.2025 04:40 |
Photo ID: | 8940573 |
VIRIN: | 250215-F-LQ671-1057 |
Resolution: | 6262x4175 |
Size: | 3.94 MB |
Location: | (UNDISCLOSED LOCATION) |
Web Views: | 16 |
Downloads: | 2 |
This work, Airmen build and expand a hot cargo pad and marshalling yard in the U.S. CENTCOM AOR [Image 7 of 7], by MSgt Luke Olson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.