Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Airmen build and expand a hot cargo pad and marshalling yard in the U.S. CENTCOM AOR [Image 4 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Airmen build and expand a hot cargo pad and marshalling yard in the U.S. CENTCOM AOR

    (UNDISCLOSED LOCATION)

    02.15.2025

    Photo by Master Sgt. Luke Olson 

    United States Air Forces Central           

    U.S. Air Force assigned to the 332nd Expeditionary Civil Engineering Squadron vehicles prep the subgrade for a contractor to install asphalt on a hot cargo pad extension in the U.S. Central Command area of responsibility, Feb. 15, 2025. The extension will allow multiple aircraft to load and unload cargo simultaneously, expanding capabilities in the region. (U.S. Air Force photo by Master Sgt. Luke Olson)

    IMAGE INFO

    Date Taken: 02.15.2025
    Date Posted: 03.28.2025 04:40
    Photo ID: 8940573
    VIRIN: 250215-F-LQ671-1057
    Resolution: 6262x4175
    Size: 3.94 MB
    Location: (UNDISCLOSED LOCATION)

    Web Views: 16
    Downloads: 2

    PUBLIC DOMAIN