Builder 2nd Class Kyle Neuman, left, and Construction Mechanic 3rd Class Danial Nichols, from Construction Dive Detachment Alpha of Underwater Construction Team 2, based in Port Hueneme, Calif., restore a structural pile at the Hotel Pier at Joint Base Pearl Harbor-Hickam. The underwater construction team provides a capability for construction, inspection, repair, and maintenance of ocean facilities in support of Naval and Marine Corps operations. (U.S. Navy photo by Mass Communication Specialist 2nd Class Sean Furey/Released)
Date Taken: | 03.13.2013 |
Date Posted: | 03.14.2013 22:16 |
Photo ID: | 887000 |
VIRIN: | 130313-N-WX059-124 |
Resolution: | 3000x2249 |
Size: | 791.43 KB |
Location: | PEARL HARBOR, HAWAII, US |
Web Views: | 39 |
Downloads: | 4 |
This work, Structural pile restoration [Image 4 of 4], by Capt. Lou Burton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.