Builder 2nd Class Justin Lieder, assigned to Construction Dive Detachment Alpha, part of Underwater Construction Team 2, out of Port Hueneme, Calif., chips concrete during a structural pile restoration at the Hotel Pier at Joint Base Pearl Harbor-Hickam. The underwater construction team provides a capability for construction, inspection, repair, and maintenance of ocean facilities in support of naval and Marine Corps operations. (U.S. Navy photo by Mass Communication Specialist 2nd Class Sean Furey/Released)
| Date Taken: | 03.13.2013 |
| Date Posted: | 03.14.2013 22:16 |
| Photo ID: | 886998 |
| VIRIN: | 130313-N-WX059-041 |
| Resolution: | 3000x2161 |
| Size: | 1.11 MB |
| Location: | PEARL HARBOR, HAWAII, US |
| Web Views: | 45 |
| Downloads: | 6 |
This work, Structural pile restoration [Image 4 of 4], by Capt. Lou Burton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.