User frame fixture on a mockup part created by NUWC Division, Keyport Mechanical Engineer Keegan Webster at the Keyport Innovation Center for a cold spray repair project. (U.S. Navy photo by Keegan Webster/Released)
| Date Taken: | 10.21.2024 |
| Date Posted: | 01.14.2025 21:54 |
| Photo ID: | 8830668 |
| VIRIN: | 241021-N-VX206-1003 |
| Resolution: | 5472x3648 |
| Size: | 5.64 MB |
| Location: | KEYPORT, WASHINGTON, US |
| Web Views: | 74 |
| Downloads: | 6 |
This work, Keyport Innovation Center helps engineer overcome project delay with 3D-printed mockups [Image 3 of 3], by Frank Kaminski, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.