USACE Hydraulic Engineer Zac Corum checks a GPS unit placed in a log. Holes are drilled holes into the metal panel to help increase cellular connection.
| Date Taken: | 10.10.2024 |
| Date Posted: | 10.11.2024 20:50 |
| Photo ID: | 8691331 |
| VIRIN: | 241010-A-VA654-2888 |
| Resolution: | 3024x4032 |
| Size: | 3.05 MB |
| Location: | LIBBY, MONTANA, US |
| Web Views: | 13 |
| Downloads: | 1 |
This work, Libby Dam Engineering with Nature Project [Image 11 of 11], by Nicole Celestine, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.