From the December 1, 1967 edition of Service to the Fleet, using a “strong back spreader”, James Creecy, Raymond Griffin, John H. Brinkley, G. Earl Thompson, Wincel E Lawson and Clarence E. Doll guide the 42-ton bulkhead into place. The bulkhead was the first major structural installation and was key to the entire repair sequence.
| Date Taken: | 10.01.2024 |
| Date Posted: | 10.04.2024 09:10 |
| Photo ID: | 8677878 |
| VIRIN: | 241001-N-N2259-5667 |
| Resolution: | 1214x882 |
| Size: | 393.71 KB |
| Location: | PORTSMOUTH, VIRGINIA, US |
| Web Views: | 31 |
| Downloads: | 1 |
This work, The Heritage Hour: FORRESTAL, Fire and NNSY [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.