Salvors with the Unified Command continue to remove roadbed material, crushed containers, and portions of the steel trusses from the Francis Scott Key Bridge from the bow of the M/V DALI, May 7, 2024. The Unified Command is continuing efforts to remove the M/V Dali, which is required to fully re-open the Fort McHenry Channel. (Key Bridge Response 2024 Unified Command photo by USACE public affairs specialist Elizabeth Lockyear)
Date Taken: | 05.07.2024 |
Date Posted: | 05.08.2024 17:45 |
Photo ID: | 8391657 |
VIRIN: | 240507-A-CZ991-1002 |
Resolution: | 6000x4800 |
Size: | 14.88 MB |
Location: | BALTIMORE, MD, US |
Web Views: | 153 |
Downloads: | 7 |
This work, Key Bridge Response [Image 4 of 4], by Elizabeth Lockyear, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT