Salvors with the Unified Command work to remove a steel truss from the Francis Scott Key Bridge in the Patapsco River, May 7, 2024. Debris and wreckage removal is on-going in support of a top priority to safely and efficiently open the Fort McHenry Channel. Key Bridge Response 2024 Unified Command photo by USACE public affairs specialist Elizabeth Lockyear
| Date Taken: | 05.07.2024 |
| Date Posted: | 05.08.2024 17:45 |
| Photo ID: | 8391656 |
| VIRIN: | 240507-A-CZ991-1003 |
| Resolution: | 6000x4000 |
| Size: | 13.36 MB |
| Location: | BALTIMORE, MARYLAND, US |
| Web Views: | 159 |
| Downloads: | 9 |
This work, Key Bridge Response [Image 4 of 4], by Elizabeth Lockyear, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.