Electrical Engineer Ramzy Hudson (Front) and Senior Electronics Mechanic Luke Ditto, U.S. Army Corps of Engineers Nashville District Electronic Service Section, work to program the user interface in support of installation of a supervisory control and data acquisition system April 18, 2024, at the Dale Hollow Dam Powerplant on the Obey River in Celina, Tennessee. (USACE Photo by Leon Roberts)
Date Taken: | 04.18.2024 |
Date Posted: | 04.26.2024 14:59 |
Photo ID: | 8366134 |
VIRIN: | 240418-A-EO110-1005 |
Resolution: | 7360x4912 |
Size: | 22.72 MB |
Location: | CELINA, TN, US |
Web Views: | 6 |
Downloads: | 2 |
This work, Team installs station control and data acquisition system [Image 6 of 6], by Leon Roberts, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT