(e.g. yourname@email.com)

Forgot Password?

    Or login with Facebook

    300-ton Chickamauga Lock approach wall beams being assembled at Watts Bar [Image 1 of 5]

    300-ton Chickamauga Lock approach wall beams being assembled at Watts Bar

    DECATUR, TN, UNITED STATES

    01.31.2013

    Photo by Fred Tucker 

    U.S. Army Corps of Engineers, Nashville District

    Mike Arles, quality assurance representative on the Chickamauga Lock Replacement Project checks steel cables that will be post-tensioned to 441-tons pressure connecting three sections of an approach wall beam at Watts Bar Dam, Decatur, Tenn., Jan. 31, 2013. The beams are being assembled and stored at Watts Bar for placement in the Chickamauga Lock Replacement Project when required for construction. (USACE photo by Fred Tucker)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 01.31.2013
    Date Posted: 02.07.2013 14:46
    Photo ID: 829337
    VIRIN: 130131-A-HL948-012
    Resolution: 4288x2848
    Size: 4.81 MB
    Location: DECATUR, TN, US 

    Web Views: 26
    Downloads: 5
    Podcast Hits: 0

    PUBLIC DOMAIN