From the vantage point of the Dallas levee access road, Aaron Philips, USACE Construction Project Coordinator, right, overlooks 277k levee construction area with a with a construction company representative during final inspection.
| Date Taken: | 08.03.2023 |
| Date Posted: | 11.16.2023 15:55 |
| Photo ID: | 8126733 |
| VIRIN: | 230803-A-QV643-1001 |
| Resolution: | 4032x3024 |
| Size: | 1.77 MB |
| Location: | DALLAS, TEXAS, US |
| Web Views: | 37 |
| Downloads: | 2 |
This work, Milestone Achievement for Dallas Floodway Project: Providing Flood Risk Management to Communities [Image 2 of 2], by Audrey Gossett, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.