A new dormitory under construction sits at the Blatchford-Preston Complex before workers arrive to continue building here April 5. The dormitory's estimated completion is April 2013. (U.S. Air Force photo/Staff Sgt. Nathanael Callon)
Date Taken: | 04.05.2012 |
Date Posted: | 11.20.2012 22:45 |
Photo ID: | 787265 |
VIRIN: | 120405-F-MS171-006 |
Resolution: | 4256x2832 |
Size: | 2.05 MB |
Location: | (UNDISCLOSED LOCATION) |
Web Views: | 6 |
Downloads: | 1 |
This work, New dormitory under construction [Image 16 of 16], by Capt. Nathanael Callon, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT