Norfolk Naval Shipyard's Temporary Services Generator Maintenance Team and Nuclear Facilities and Generators Team work together to ensure all generators are at top condition so America's Shipyard stays mission-ready at all times.
| Date Taken: | 04.18.2023 |
| Date Posted: | 06.21.2023 07:35 |
| Photo ID: | 7872585 |
| VIRIN: | 230418-N-XX785-002 |
| Resolution: | 5504x3669 |
| Size: | 13.59 MB |
| Location: | PORTSMOUTH, VIRGINIA, US |
| Web Views: | 25 |
| Downloads: | 3 |
This work, Powering Up the Shipyard: Generator Maintenance Team Brings New Capabilities to Ensure America’s Shipyard Stays Mission-Ready [Image 5 of 5], by Daniel DeAngelis, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.