Col. Mark Toy, U.S. Army Corps of Engineers Los Angeles District commander, speaks at the Nov. 2 ribbon-cutting ceremony for the Tucson Arroyo Project Phase II B Park Avenue Basins project while a group of students from the nearby Highland Free School watches. The project, developed in partnership with the Pima County Regional Flood Control District; the City of Tucson; the Tucson Unified School District and the Corps of Engineers, is designed to provide for flood risk management and ecosystem restoration along the Tucson Arroyo within the Arroyo Chico watershed.
Date Taken: | 11.02.2012 |
Date Posted: | 11.06.2012 15:19 |
Photo ID: | 776682 |
VIRIN: | 121102-A-TV651-093 |
Resolution: | 2100x1500 |
Size: | 702.74 KB |
Location: | TUCSON, ARIZONA, US |
Web Views: | 18 |
Downloads: | 1 |
This work, District helps dedicate Tucson project [Image 3 of 3], by Daniel J. Calderón, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.