Concrete is transferred into a front loader during the runway reconstruction project at Kunsan Air Base, Republic of Korea, April 24, 2023. More than 1500 concrete slabs will be repaired throughout the 5 month project. (U.S. Air Force photo by Tech. Sgt. Timothy Dischinat)
| Date Taken: | 04.24.2023 |
| Date Posted: | 04.24.2023 03:57 |
| Photo ID: | 7756887 |
| VIRIN: | 230424-F-YO204-0032 |
| Resolution: | 7360x4912 |
| Size: | 8.79 MB |
| Location: | BUSAN GWANG'YEOGSI [PUSAN-KWANGYOKSHI], KR |
| Web Views: | 43 |
| Downloads: | 4 |
This work, Kunsan Runway reconstruction: concrete evidence! [Image 4 of 4], by MSgt Timothy Dischinat, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.