Water flows over the fuse gates of Terminus Dam at Lake Kaweah in Tulare County, California, March 17, 2023, following a series of atmospheric rivers that filled the reservoir to its capacity at 185,630 acre-feet. The resulting spillway flow lasted about 36 hours and reached approximately 1,000 cubic feet per second at its peak. (Photo - Ryan Watson, U.S. Army Corps of Engineers, Sacramento District/Released)
| Date Taken: | 03.17.2023 |
| Date Posted: | 04.14.2023 19:17 |
| Photo ID: | 7741244 |
| VIRIN: | 230317-A-A1419-0003 |
| Resolution: | 4000x3000 |
| Size: | 2.16 MB |
| Location: | CALIFORNIA, US |
| Web Views: | 123 |
| Downloads: | 4 |
This work, Water Flows Over Fuse Gates of Terminus Dam [Image 7 of 7], by Ryan Watson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.