Engineers from Fort Stewart’s Directorate of Public Works and the Savannah District U.S. Army Corps of Engineers walk the site of the future barracks construction on the installation March 3 during a charrette. The 360-bed facility will be complete in 2027.
| Date Taken: | 03.03.2023 |
| Date Posted: | 03.07.2023 09:04 |
| Photo ID: | 7667830 |
| VIRIN: | 230303-O-WJ404-731 |
| Resolution: | 4032x3024 |
| Size: | 3.15 MB |
| Location: | FORT STEWART, GEORGIA, US |
| Web Views: | 30 |
| Downloads: | 3 |
This work, Barracks charrette focuses on quality of life, mold mitigation for new barracks construction [Image 3 of 3], by Kevin Larson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.