Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Barracks charrette focuses on quality of life, mold mitigation for new barracks construction [Image 1 of 3]

    Barracks charrette focuses on quality of life, mold mitigation for new barracks construction

    FORT STEWART, GA, UNITED STATES

    03.03.2023

    Photo by Kevin Larson 

    Fort Stewart Public Affairs Office

    Fort Stewart-Hunter Army Airfield garrison command team Col. Manny Ramirez and Command Sgt. Maj. Bryan Buchanan look at a architectural draft of the new barracks to be built on Fort Stewart during a charrette March 3 at the Directorate of Public Works. Engineers from DPW and the Savannah District U.S. Army Corps of Engineers briefed the command team on the design aspects of the new barracks. Construction is expected to be complete in 2027.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.03.2023
    Date Posted: 03.07.2023 09:04
    Photo ID: 7667829
    VIRIN: 230303-O-WJ404-663
    Resolution: 4032x3024
    Size: 3.34 MB
    Location: FORT STEWART, GA, US

    Web Views: 25
    Downloads: 3

    PUBLIC DOMAIN