Researchers at the U.S. Army Engineer Research and Development Center constructed a model of the filling and emptying system of the Montgomery Lock on the Ohio River to test designs for a new auxiliary lock structure. The model allows the team to take a closer look at the details inside the lock, like the intakes, the culvert layout, the outlets and valve operation times. (U.S. Army Corps of Engineers photo)
Date Taken: | 05.11.2022 |
Date Posted: | 08.03.2022 13:45 |
Photo ID: | 7340651 |
VIRIN: | 220511-A-UH946-002 |
Resolution: | 4176x2784 |
Size: | 8.38 MB |
Location: | VICKSBURG, MISSISSIPPI, US |
Web Views: | 19 |
Downloads: | 4 |
This work, ERDC researchers test designs for lock improvements along the Upper Ohio River [Image 2 of 2], by Khary Ratliff, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.