Contractors lay cement using an excavator, as part of the runway extension Oct. 5, 2012, at RAF Mildenhall, England. The pavement-quality concrete is laid to a thickness of 380 millimeters. Once dried, a saw is used to cut lines in the concrete, before being filled with a special sealant which allows it to expand and contract, to avoid cracking.
Date Taken: | 10.05.2012 |
Date Posted: | 10.17.2012 07:24 |
Photo ID: | 726251 |
VIRIN: | 121005-F-EJ686-028 |
Resolution: | 2258x1500 |
Size: | 1001.83 KB |
Location: | MILDENHALL, ENG, GB |
Web Views: | 11 |
Downloads: | 0 |
This work, Construction for runway extension underway [Image 5 of 5], by Karen Abeyasekere, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT