From left, Jeff Quattlebaum, cooling water system engineer with National Aerospace Solutions, LLC, (NAS); Ethan Rosenblum, a superintendent with Healtheon; and Brian A. Emmons, a NAS construction superintendent, review the operations manual for the new pump, right side of image, installed at the Primary Pumping Station for Arnold Air Force Base, Tenn., Aug. 4, 2021. NAS is the Test Operations and Sustainment contractor for Arnold Engineering Development Complex, headquartered at Arnold AFB. Healtheon, a small HUBZone contractor, was responsible for installing the new pump. (U.S. Air Force photo by Jill Pickett)
Date Taken: | 08.04.2021 |
Date Posted: | 02.22.2022 15:01 |
Photo ID: | 7062705 |
VIRIN: | 210804-F-KN521-3001 |
Resolution: | 8358x5982 |
Size: | 12.59 MB |
Location: | ARNOLD AFB, TENNESSEE, US |
Web Views: | 36 |
Downloads: | 2 |
This work, Arnold AFB pumping station receives crucial investment [Image 5 of 5], by Jill Pickett, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.