The U.S. Army Corps of Engineers Nashville District and contractors from Voith Hydro installed a 249-ton hydropower rotor on June 19, 2017, at Center Hill Dam in Lancaster, Tennessee.
| Date Taken: | 06.19.2017 |
| Date Posted: | 02.11.2022 12:03 |
| Photo ID: | 7048465 |
| VIRIN: | 170619-A-A1409-0001 |
| Resolution: | 2772x1980 |
| Size: | 3.37 MB |
| Location: | LANCASTER, TENNESSEE, US |
| Web Views: | 45 |
| Downloads: | 5 |
This work, Turbine-generators replaced at Center Hill Hydropower Plant [Image 3 of 3], by Misty Cunningham, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.