Construction equipment is shown set up at Fort McCoy’s South J Street on Aug. 26, 2021, so a bridge can be repaired on the street. The street is closed from Aug. 23 through Oct. 29, 2021, from South 8th Avenue to South 9th Avenue for construction of a new bridge over Tarr Creek. Fort McCoy’s Directorate of Public Works is in charge of construction coordination. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
| Date Taken: | 08.26.2021 |
| Date Posted: | 08.27.2021 16:25 |
| Photo ID: | 6807354 |
| VIRIN: | 210826-A-OK556-673 |
| Resolution: | 1984x2388 |
| Size: | 797.25 KB |
| Location: | FORT MCCOY, WISCONSIN, US |
| Web Views: | 3 |
| Downloads: | 2 |
This work, Construction of new bridge underway at Fort McCoy [Image 9 of 9], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.