U.S. Army Corps of Engineers Tulsa District’s Fort Gibson Dam released water at 10,100 cubic feet per second via hydroelectric power turbines during the 2021 Winter Storm.
| Date Taken: | 02.17.2021 |
| Date Posted: | 05.05.2021 10:58 |
| Photo ID: | 6630249 |
| VIRIN: | 210217-A-PT304-001 |
| Resolution: | 2016x980 |
| Size: | 425.01 KB |
| Location: | DALLAS, TEXAS, US |
| Hometown: | TULSA, OKLAHOMA, US |
| Web Views: | 39 |
| Downloads: | 6 |
This work, USACE division, 6 districts & 24 hydropower plants help stabilize regional power grid during 2021 Polar Vortex [Image 2 of 2], by Edward Johnson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.