U.S. Army Corps of Engineers Buffalo District contractor Ryba Marine Construction Co. pumps out dredged material from a scow in Cleveland Harbor and into a confined disposal facility, Cleveland, OH, November 3, 2020. The Dredge CT150 with a Lima 2400B Clamshell Crane was responsible for the dredging of 55,000 cubic yards of dredged material from the Upper Cuyahoga River.
| Date Taken: | 11.03.2020 |
| Date Posted: | 12.18.2020 10:26 |
| Photo ID: | 6462160 |
| VIRIN: | 201103-A-PG036-110 |
| Resolution: | 5865x3291 |
| Size: | 12.66 MB |
| Location: | US |
| Web Views: | 92 |
| Downloads: | 7 |
This work, Cleveland Harbor dredging and pump-out [Image 17 of 17], by Jess Levenson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.