Vince Marcin, painter, participates in the prewash and prime step of the AN/TSC-167 Satellite Transportable Terminal overhaul process. Marcin is assigned to the Systems Integration and Support Directorate’s System Prep Branch.
Date Taken: | 11.04.2020 |
Date Posted: | 11.23.2020 16:20 |
Photo ID: | 6433361 |
VIRIN: | 201104-A-TB732-5032 |
Resolution: | 1500x1001 |
Size: | 256.84 KB |
Location: | PENNSYLVANIA, US |
Web Views: | 27 |
Downloads: | 6 |
This work, Team capability secures maintenance excellence awards [Image 11 of 11], by Thomas Robbins, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.