Soldiers with Wisconsin Army National Guard’s 829th Engineer Company (Vertical Construction) and personnel with the Fort McCoy Logistics Readiness Center Transportation Division conduct redeployment rail operations Oct. 27, 2020 at Fort McCoy, Wis. The rail offload operations took places between Oct. 26 and 30, 2020. The offload included 37 railcars containing 102 pieces of rolling stock and container emptying operations. Whether it was moving troops and equipment during World War II or other contingencies, or bringing in or sending out equipment and supplies for a present-day exercise, rail will always be a primary mode of transportation at the installation. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 10.27.2020 |
Date Posted: | 10.30.2020 12:00 |
Photo ID: | 6407145 |
VIRIN: | 201027-A-OK556-571 |
Resolution: | 4889x3259 |
Size: | 2.63 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 5 |
Downloads: | 3 |
This work, Engineer unit's equipment offloaded from railcars at Fort McCoy after deployment [Image 65 of 65], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.