Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    B-1B Integrated Battle Station modification completed [Image 3 of 6]

    B-1B Integrated Battle Station modification completed

    TINKER AFB, OK, UNITED STATES

    09.25.2020

    Photo by Paul Shirk 

    72nd Air Base Wing

    Members of the 10th Flight Test Squadron pose for a group picture in front of two B-1B Lancer aircraft after the B-1 Integrated Battle Station Modification Sunset Ceremony held at Tinker Air Force Base, Oklahoma, Sept. 25, 2020. The modifications, which were the largest upgrade in the B-1's history, were completed ahead of schedule and included enhanced displays, navigation and communication systems. (U.S. Air Force photo by Paul Shirk)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.25.2020
    Date Posted: 09.29.2020 14:26
    Photo ID: 6373661
    VIRIN: 200925-F-HI919-2001
    Resolution: 4880x3258
    Size: 1 MB
    Location: TINKER AFB, OK, US

    Web Views: 37
    Downloads: 8

    PUBLIC DOMAIN