200923-N-BR087-1165
TINIAN, Commonwealth of the Northern Mariana Islands (Sept. 23, 2020) Builder 2nd Class Eli Arwood, assigned to Underwater Construction Team (UCT) 2 Detachment ALFA, prepares sheet pile for measurement within the Tinian Harbor. UCT 2 is conducting inspections in part of a Maritime Infrastructure Assessment (MIA) of the Tinian Harbor and surrounding waterfront facilities during their 20-2 INDOPACOM deployment. UCT 2 provides a capability for construction, inspection, repair, and maintenance of ocean facilities in support of Naval and Marine Corps operations. (U.S. Navy photo by Mass Communication Specialist 2nd Class Cole C. Pielop)
| Date Taken: | 09.23.2020 |
| Date Posted: | 09.23.2020 08:03 |
| Photo ID: | 6359045 |
| VIRIN: | 200923-N-BR087-1165 |
| Resolution: | 1849x1387 |
| Size: | 913.44 KB |
| Location: | TINIAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLAN, US |
| Web Views: | 67 |
| Downloads: | 17 |
This work, Underwater Construction Team 2 Inspects Pier in Tinian [Image 7 of 7], by CPO Cole Pielop, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.