U.S. Army Corps of Engineers Nashville District and Bauer Foundation Corporation management and personnel pose for photos on a specialty drill rig July 11, 2012 during a “First Bite” ceremony to begin constructing a subsurface concrete wall as a barrier for potentially harmful seepage water moving beneath the earthen dam. (USACE photo by Fred Tucker)
| Date Taken: | 07.11.2012 |
| Date Posted: | 07.12.2012 17:52 |
| Photo ID: | 623089 |
| VIRIN: | 120711-A-HL948-010 |
| Resolution: | 4288x2848 |
| Size: | 6.98 MB |
| Location: | LANCASTER, TENNESSEE, US |
| Web Views: | 81 |
| Downloads: | 3 |
This work, Construction begins with ‘first bite’ on foundation barrier wall at Center Hill Dam [Image 3 of 3], by Fred Tucker, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.