(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    New work center created at RIA factory [Image 1 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    New work center created at RIA factory

    ROCK ISLAND ARSENAL, ILLINOIS, UNITED STATES

    02.13.2019

    Photo by Debralee Lutgen 

    Rock Island Arsenal-Joint Manufacturing and Technology Center

    ROCK ISLAND ARSENAL, Ill. – A new work center has been created at Rock Island Arsenal – Joint Manufacturing and Technology Center. The Master Production Scheduling or MPS office coordinates and carries out long and short term capacity planning and scheduling while improving efficiency and productivity. This 12 employee team has a diverse background including capacity planning, resource management, operations management, estimating, production control and machining. The team’s goal includes achieving and maintaining desired production levels to meet original customer requirements by reviewing and providing viable solutions for capacity requirements, bottlenecks and constraints. This team is designed to improve performance to promise. (U.S. Army photo by Debralee Best/RIA-JMTC)

    IMAGE INFO

    Date Taken: 02.13.2019
    Date Posted: 05.14.2020 13:22
    Photo ID: 6209509
    VIRIN: 190213-A-FW423-004
    Resolution: 2400x1600
    Size: 2.94 MB
    Location: ROCK ISLAND ARSENAL, ILLINOIS, US

    Web Views: 19
    Downloads: 1

    PUBLIC DOMAIN