Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Or login with Facebook

    JBPHH Pier Repair Project [Image 3 of 3]

    JBPHH Pier Repair Project

    PEARL HARBOR, HI, UNITED STATES

    04.06.2020

    Photo by Petty Officer 2nd Class Charles Oki 

    Commander Navy Region Hawaii

    200406-N-SF508-0221 JOINT BASE PEARL HARBOR-HICKAM (April 6, 2020) U.S. Army divers assigned to the 7th Engineer Dive Detachment, 8th Theater Sustainment Command, observe the removal of damaged wood pylons during a joint pier repair project at Joint Base Pearl Harbor-Hickam. The project removed more than a dozen damaged pylons to ensure the continued usage of the pier by removing potential navigational hazards. Navy Region Hawaii, Navy Facilities Engineering Command Hawaii, Joint Base Pearl Harbor-Hickam, Construction Battalion Maintenance Unit 303 and U.S. Army 7th Engineer Detachment took part in the project. (U.S. Navy photo by Mass Communication Specialist 2nd Class Charles Oki/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 04.06.2020
    Date Posted: 04.07.2020 00:01
    Photo ID: 6164516
    VIRIN: 200406-N-SF508-0221
    Resolution: 6048x4024
    Size: 2.39 MB
    Location: PEARL HARBOR, HI, US 

    Web Views: 39
    Downloads: 4
    Podcast Hits: 0

    PUBLIC DOMAIN