200406-N-SF508-0067 JOINT BASE PEARL HARBOR-HICKAM (April 6, 2020) A Joint Base Pearl Harbor-Hickam tug moves a damaged wood pylon during a joint pier repair project at Joint Base Pearl Harbor-Hickam. The project removed more than a dozen damaged pylons to ensure the continued usage of the pier by removing potential navigational hazards. Navy Region Hawaii, Navy Facilities Engineering Command Hawaii, Joint Base Pearl Harbor-Hickam, Construction Battalion Maintenance Unit 303 and U.S. Army 7th Engineer Detachment took part in the project. (U.S. Navy photo by Mass Communication Specialist 2nd Class Charles Oki/Released)
Date Taken: | 04.06.2020 |
Date Posted: | 04.07.2020 00:01 |
Photo ID: | 6164515 |
VIRIN: | 200406-N-SF508-0067 |
Resolution: | 6057x4042 |
Size: | 2.88 MB |
Location: | PEARL HARBOR, HI, US |
Web Views: | 61 |
Downloads: | 4 |
This work, JBPHH Pier Repair Project [Image 3 of 3], by PO1 Charles Oki, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT